8-56
8
È
Backlash measurement (BL2)
É
Shim thickness adjustment
TIP:
• If the shim thickness adjustment value is
positive, the current shim thickness must
be increased by that amount and, if the
value is negative, the current shim thick-
ness must be decreased by that amount.
• The gray-colored area on the selection
chart indicates the range of the specified
backlash. Shimming is not required if the
measured backlash is within the gray-col-
ored area.
• The values for the shim thickness adjust-
ments specified in the selection chart are
intended to obtain the median value within
the range for the specified reverse gear
backlash.
• The table that follows the selection chart
shows the shim thickness adjustments for
the points marked on the chart.
5.
Calculate the new reverse gear shim (T2)
thickness.
Calculation formula:
New reverse gear shim (T2) thickness =
Current reverse gear shim thi
Shim thickness adjustment
Example:
Use the following formula when the shim
thickness adjustment value is negative.
Current reverse gear shim thickness = 1.25
mm
Shim thickness adjustment = –0.20 mm
New reverse gear shim (T2) thickness
= 1.25 mm + (–0.20) mm
= 1.05 mm
TIP:
• Use the least number of shims to obtain the
required shim thickness.
• If the calculated shim thickness cannot be
obtained with a combination of the avail-
able shims, increase the shim thickness by
0.01 mm.
6.
Install the determined reverse gear
shims (T2) and reverse gear. See steps
3 and 4 in “Assembling the propeller
shaft housing assembly” (8-18).
–0.35 –0.32
0.21 0.30
0.34
0
5
85
90
95
0.
1
0.40
0.20
0
–0.20
–0.40
0
5
85
90
95
10
È
É
É
(mm)
È
(1/100 mm)
b
a
Available shim thicknesses:
0.10, 0.12, 0.15, 0.18, 0.30, 0.40, 0.50
mm
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...