7-12
7
5.
Install the cover
7
and aprons
8
.
TIP:
Make sure that the ground lead
a
is routed
through the gap between the aprons and is
not pinched.
6.
Connect the PTT relay terminals
b
, and
then tighten the PTT relay terminal bolts
9
to the specified torque.
7.
Install the caps
0
, and then fasten the
PTT motor lead
c
using the plastic tie
A
and holders
B
.
TIP:
To fasten the PTT motor lead, see “Wiring
harness routing” (5-6).
8.
Connect the cooling water hose
C
, and
then fasten it using the clamp
D
.
9.
Fasten the cooling water hose
C
using
the holder
E
.
10. Connect the neutral switch coupler
d
,
and then install the neutral switch coupler
to the bracket
F
.
11. Connect the shift cut switch coupler
e
.
12. Fasten the neutral switch lead and wiring
harness using the holder
G
and
H
.
13. Install a new O-ring and the dipstick
guide
I
, and then install the dipstick
J
.
14. Install the intake manifold (STBD). See
“Installing the intake manifold” (6-18).
PTT relay terminal bolt
9
:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
8
7
8
a
STBD
9
b
b
0
0
B
A
c
B
G
H
I
J
E C D
F
e
d
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...