6-23
FUEL
Fuel system
Removing the throttle body
assembly
1.
Disconnect the throttle body assembly
wiring harness extension coupler
a
and
ETV coupler
b
.
2.
Remove the wiring harness
1
.
3.
Remove the vacuum hose
2
from the
holder
3
, and then disconnect the vac-
uum hose
2
.
4.
Disconnect the vapor gas hoses
4
and
5
.
5.
Remove the plastic tie
6
, and then
remove the joint
7
.
6.
Remove the throttle body assembly
8
.
7.
Remove the hoses and check valve
9
.
Checking the canister check valve
1.
Connect the special service tool
1
to the
canister check valve port.
2.
Apply positive pressure and check that
air comes out of the opposite end of the
canister check valve. Replace the canis-
ter check valve if no air comes out.
a
b
1
5
5
4
2
2
3
8
6
7
9
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...