6-29
FUEL
Fuel system
2.
Connect the special service tool
1
to the
atmospheric port
a
and block the other
ports
b
with rubber plugs
2
.
3.
Apply the specified positive pressure and
check that there is no air leakage.
Replace the canister if there is air leak-
age.
Installing the canister, throttle body,
and surge tank
Do not reuse a gasket, always replace it
with a new one.
1.
Install the air pressure sensor
1
, and
then tighten the air pressure sensor bolt
2
to the specified torque.
2.
Install a new gasket
3
and the throttle
damper plate
4
, and then tighten the
throttle damper plate bolts
5
to the spec-
ified torque.
3.
Install a new gasket
6
, the throttle body
7
and the bracket
8
, and then tighten
the throttle body nuts
9
to the specified
torque.
4.
Install the holder
0
and vapor shut-off
valve
A
, and then tighten the vapor shut-
off valve nut
B
to the specified torque.
5.
Install the throttle body assembly wiring
harness extension coupler
a
to the
holder
b
on the bracket
8
.
6.
Fasten the throttle body assembly wiring
harness extension
C
and holder
0
using
the plastic tie
D
.
7.
Connect the air pressure sensor coupler
c
and vapor shut-off valve coupler
d
.
Vacuum/pressure pump gauge set
1
:
90890-06756
Specified positive pressure:
19.6 kPa (0.196 kgf/cm
2
, 2.8 psi)
Air pressure sensor bolt
2
:
5 N·m (0.5 kgf·m, 3.7 ft·lb)
2
1
b
a
1
2
Throttle damper plate bolt
5
:
13 N·m (1.3 kgf·m, 9.6 ft·lb)
Throttle body nut
9
:
13 N·m (1.3 kgf·m, 9.6 ft·lb)
Vapor shut-off valve nut
B
:
5 N·m (0.5 kgf·m, 3.7 ft·lb)
8
9
7
4
5
9
6
3
5
0
D
8
A
C
d
a
c
B
b
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...