Putting into operation
Photometrical measurements
32
BA61101/08.00/Pla/MLP5-E2
BA61101/08.00/Pla/MLP5-E2
33
Accumulator charging
Charging the accumulator:
- Connect line adaptor
Charging time is approx. 16 hours (48 hours for first putting into
operation).
If the meter is not operated the fully charged accumulator remains
charged for approx.3 months.
A charging of the accumulator is necessary when charging symbol
is displayed, e.g.:
or
If this symbol is displayed
the accumulator must be
charged.
The charging symbol extinguishes after approx. 3 min. after
connecting the line adaptor.
Measurement
Select filter position
(refer to method list).
Ready to measure e.g.
COD-vial test C1/25.
C1/25 = Model number.
Insert vial/cuvette.
Display of test value.
Serial measurements
Last test value.
Insert further vials/cuvettes.
Test value is displayed.
Содержание MultiLab P5
Страница 2: ......
Страница 12: ......
Страница 56: ......
Страница 96: ......
Страница 201: ...Configuration BA61101 08 00 IWA MLP5 E2 201 meas A 360nm Aref new filter description...
Страница 242: ...Technical data 242 BA61101 08 00 IPro MLP5 E3 Test certificate EMC...
Страница 244: ......