
Setup & Operation
Sawmill Setup
Setup & Operation
15doc080213
3-1
3
SECTION 3 SETUP & OPERATION
3.1
Sawmill Setup
IMPORTANT!
Before starting to use the sawmill you have to meet
the following conditions:
Set up the sawmill on firm, level ground and level the sawmill. Secure the sawmill to the
ground to prevent moving during operation. A concrete foundation or pads (rated to
support 31 T/m
2
at each sawmill foot position) and 16mm anchored bolts are
recommended.
Under roof, the sawmill should always be operated with the sawdust collection system.
The sawmill can be operated in temperature range from -15
o
C to 40
o
C only.
The illumination at the operator's position should be at least 300lx.
The sawmill operator’s position is shown below.
The LT15 sawmills are only partially aligned in factory. Some assemblies need to be aligned by a
user before first usage of the sawmill.
Assemblies aligned in factory:
Blade drive belt tension;
Engine rpm (DC only);
Blade wheels (in vertical and horizontal planes);
Blade guide arm alignment -
Blade guides -
;
Blade Height Scale -
;
!
150189a
Содержание LT15M2 D10
Страница 1: ...Table of Contents Section Page Table of Contents SW 07doc0802131...
Страница 2: ......