9.4
Clean the turbocharger during operation
Periodicity
Description
Weeks
1
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
Cleaning fluid
A/R
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
CAUTION
Damage Hazard: For an engine with LP SCR system, do not do this procedure, if there is
gas flow through the LP SCR reactor. This could cause damage to the components of the
SCR system.
PRELIMINARY OPERATIONS
•
None
X92-B
AA00-6500-00AAA-200A-A
Operation Manual
Clean the turbocharger during operation
Winterthur Gas & Diesel Ltd.
- 306 -
Issue 002 2021-11
Содержание X92-B
Страница 8: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 8 Issue 002 2021 11...
Страница 12: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 12 Issue 002 2021 11...
Страница 113: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 113 Issue 002 2021 11...
Страница 241: ...7 Installation 7 1 Installation 242 X92 B Operation Manual Winterthur Gas Diesel Ltd 241 Issue 002 2021 11...