
9.5
Clean the scavenge air cooler during operation
Periodicity
Description
Weeks
1
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
Cleaning fluid
A/R
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
None
X92-B
AA00-6600-00AAA-200A-A
Operation Manual
Clean the scavenge air cooler during operation
Winterthur Gas & Diesel Ltd.
- 308 -
Issue 002 2021-11
Содержание X92-B
Страница 8: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 8 Issue 002 2021 11...
Страница 12: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 12 Issue 002 2021 11...
Страница 113: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 113 Issue 002 2021 11...
Страница 241: ...7 Installation 7 1 Installation 242 X92 B Operation Manual Winterthur Gas Diesel Ltd 241 Issue 002 2021 11...