•
The bearings
•
The temporarily secured parts
•
The oil flow through bearings
•
The tightness of blanked-off openings
15
After 60 minutes of running, open the crankcase and check:
•
The bearings
•
The temporarily secured parts
•
The oil flow through bearings
•
The tightness of blanked-off openings
The cylinder is now cut out and the engine performs under special running conditions.
Fig 10-24
Allowed load during cylinder cut out
X92-B
AA00-0000-00AAA-100A-A
Operation Manual
Special running condition: Cylinder cut out
Winterthur Gas & Diesel Ltd.
- 414 -
Issue 002 2021-11
Содержание X92-B
Страница 8: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 8 Issue 002 2021 11...
Страница 12: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 12 Issue 002 2021 11...
Страница 113: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 113 Issue 002 2021 11...
Страница 241: ...7 Installation 7 1 Installation 242 X92 B Operation Manual Winterthur Gas Diesel Ltd 241 Issue 002 2021 11...