10.15
Fuel pump - cutting out
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
1
Support equipment
Description
Part No.
CSN
QTY
Flange
94569
1
Flange
94569A
1
Roller lifting tool
94430
1
Pre-tensioner
94430A
1
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
WARNING
Injury hazard: The cutting out procedure can only be done when the engine is stop.
WARNING
Injury hazard: Before you operate the turning gear, make sure that no personnel are near
the flywheel or the engine.
CAUTION
Damage hazard: When the fuel pump is unserviceable, repair the fault immediately. If the
fault cannot be repaired, because the engine must operate, it becomes necessary to cut
out the unserviceable fuel pump. This will prevent damage hazard.
X92-B
AA00-5556-00AAB-510B-A
Operation Manual
Fuel pump - cutting out
Winterthur Gas & Diesel Ltd.
- 370 -
Issue 002 2021-11
Содержание X92-B
Страница 8: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 8 Issue 002 2021 11...
Страница 12: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 12 Issue 002 2021 11...
Страница 113: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 113 Issue 002 2021 11...
Страница 241: ...7 Installation 7 1 Installation 242 X92 B Operation Manual Winterthur Gas Diesel Ltd 241 Issue 002 2021 11...