
PROCEDURE
1
Select the applicable control panel.
2
Decrease the engine load to the minimum.
3
On the control panel push the STOP button.
NOTE:
The ECS shuts down the engine in a controlled manner.
4
For a DF engine, start the exhaust ventilation sequence, if there is a ventilation request.
CLOSE UP
•
None
X92-B
AA00-0000-00AAA-131G-A
Operation Manual
Stop the engine
Winterthur Gas & Diesel Ltd.
- 285 -
Issue 002 2021-11
Содержание X92-B
Страница 8: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 8 Issue 002 2021 11...
Страница 12: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 12 Issue 002 2021 11...
Страница 113: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 113 Issue 002 2021 11...
Страница 241: ...7 Installation 7 1 Installation 242 X92 B Operation Manual Winterthur Gas Diesel Ltd 241 Issue 002 2021 11...