Turbocharger cut out procedure: Illustration 5 ...........................................
Allowed load during cylinder cut out ...........................................................
Operating range .........................................................................................
Signal codes ...............................................................................................
Viscosity / Temperature diagram ................................................................
Line codes ..................................................................................................
Process codes ............................................................................................
Signal codes ...............................................................................................
Color codes and symbols - electric connection diagram ............................
X92-B
Operation Manual
Winterthur Gas & Diesel Ltd.
- 16 -
Issue 002 2021-11
Содержание X92-B
Страница 8: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 8 Issue 002 2021 11...
Страница 12: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 12 Issue 002 2021 11...
Страница 113: ...X92 B Operation Manual Page left intentionally blank Winterthur Gas Diesel Ltd 113 Issue 002 2021 11...
Страница 241: ...7 Installation 7 1 Installation 242 X92 B Operation Manual Winterthur Gas Diesel Ltd 241 Issue 002 2021 11...