6. Cleaning
Page 38
105204
– WTS-300-E - V4.1 - 20.01.2022
n
0
1
n
0
2
n
0
3
n
1
0
n
11
n
1
2
n
1
3
n
1
4
n
1
5
n
1
6
n
2
0
n
2
1
n
2
2
n
2
3
n
2
4
n
2
5
n
2
6
n
3
0
n
3
1
n
3
2
D
1
n
3
3
D
2
H
n
3
4
n
3
5
n
3
6
n
4
0
n
4
1
n
4
2
n
4
3
n
4
4
n
4
5
n
4
6
6.2 Cleaning programme diagram (Maximum configuration)
Only available when activated in parameters
Switch-on delay for heater
Post-heating temperature during main circulation
Cleaning pump venting (if set in parameter [r80])
Switch-on delay drain valve [r26]
agitator
compressor
cold water valve
warm water valve
alk. detergent
acid detergent
drain valve
cleaning pump
heater
cleaning active
disinfection
CLEANING CYCLE
compressor
ichter
cold water valve
warm water valve
alk. detergent
acid detergent
drain valve
pump
heater
disinfection
cleaning active
Clean. St. 0
Rinse out
Cleaning stage 1
Pre-rinse 1
Cleaning stage 2
Pre-rinse 2
Cleaning stage 3
Main-rinse 1
Cleaning stage 4
Intermediate rinse 1
Level 2
Level 1
PROGRAMME STEP
Level 2
Level 1
Level 2
Level 1
Level 2
Level 1
CLEANING STAGE
CLEANING CYCLE
A CLEANING CYCLE consists of different CLEANING STAGES. Whether and how often each
individual cleaning cycle is carried out is parameterized in parameters [r40 to r49].
CLEANING STAGE
Each CLEANING STAGE consists of several 'PROGRAMME STEPS'.
The sequence of a rinsing cycle is determined by the parameterisation of the programme steps
.
PROGRAMME STEP
Each individual PROGRAMME STEP can be set via n-parameters (section 8.4). Entering '0'
deactivates a programme step.