Lync AEGIS Controller
8: APPENDIX D
L-OMM-013_A
• 4/20/2022Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
83
of
100
•
minimum interval before the next defrost operation
Defrosting starts when the evaporation temperature drops below the defrost starting
threshold. Use the UP and DOWN keys to scroll through the three pages describing
defrost operation.
The first Fa1 page displays:
•
the type of defrost: fixed or dynamic evaporation
temperature;
the dynamic evaporation mode is strongly
recommended
•
the actual evaporation temperature
•
the evaporation temperature at which defrosting starts
The second Fa2 page displays:
•
progress of the defrost cycle request. When the
evaporation temperature drops below the defrost starting
threshold, the unit begins the “enter phase” and shows
progress on the first “Enter phase” bar. In this situation,
the icon is displayed in the top right-hand corner of the
defrost status zone on the main page;
•
progress of the defrost cycle central phase. Once the
enter phase has finished, the defrost central phase
starts. The central phase progress is shown on the
second “Central phase” bar. In this situation, the icon
is displayed in the top right-hand corner of the defrost
status zone on the main page.
The third Fa3 page displays:
•
progress of the defrost cycle drop-off phase. Once the central phase has finished, the
drop-off phase starts. The drop-
off phase progress is shown in the third “Drop-off
phase” bar. In this situation, the icon is displayed in the top right-hand corner of the
defrost status zone on the main page;
•
progress of the minimum interval before the next defrost
operation. Once the drop-off phase has finished, a small
amount of time must pass before another defrost cycle can
start. This interval phase progress is shown on the fourth
“Interval phase” bar. In this situation, the icon is
displayed in the top right-hand corner of the defrost status
zone on the main page;
Modbus
address
Read
Write
Code
Meaning
Unit of
measurement
9559
R
Enter phase (visible only on the home page)
9560
R
Central phase (visible only on the home