Floor Screed Machine HD 50
27
www.utiform.com
departamento.té[email protected]
Tfno. + 34 96 570 29 82 Fax: + 34 96 570 29 83
below).
End of transport
When the mixer tank is totally empty of material, the compressed air will begin to come out without
obstacle from the transport pipe which means that the process is complete.
Next close the ball valve (
1
) towards the auxiliary compressor. Turn the triangular star reverse switch to
resting position.
When these processes are complete open the lid and begin the next mixing process.
.
Finishing the work
Use the pressure gauge (
7
). Lower the pressure to below 2 bar, pull the lever (
2
) upwards, however as
indicated previously, it is necessary to activate the safety lever (3) prior to opening the lid of the boiler.
7
5
6
8