Floor Screed Machine HD 50
11
www.utiform.com
departamento.té[email protected]
Tfno. + 34 96 570 29 82 Fax: + 34 96 570 29 83
3.3
Towing items
All work of adjustment to or assembly of transport elements shall only be carried out by the vehicle manufacturer or
authorized personnel.
Obviously, welding work should not be carried out on any part of the trailer.
In winter, transport elements should be washed with water after road transport, particularly if there is salt on
the road.
Regularly remove any encrusted dirt from the suspension axle.
The identity plaques of the trailer elements should be kept in perfect state as they should always be legible.
This way, when repairing or ordering spare parts, it is always possible to provide the manufacturer with the
specifications and details stamped on the identification plate.
1
Main chassis
2
Jockey wheel (according to model)
3
Hand brake (according to model)
4
Retention device (according to version)
5
Head of the coupling ball or pin
6
Middle part of the tow bar
7
Tow shaft
8
Suspension axle
9
Pneumatic wheels
10
Inertia brake (according to version)
11
Support and brake blocks
3.3.1 Main
chassis
The main chassis is specially constructed with quality steel which provides excellent stability for the
machine in operation.
3.3.2 Jockey
wheel
This support wheel does not require any particular maintenance.
Turn upwards, lift and check the support wheel while the machine is in operation. To place it in working position,
turn the support wheel downwards until the chassis is in horizontal position. The transfer wheel can only be placed
upwards by the support protective device when it is in unloaded state. This procedure is initiated manually.
Deployment is automatic. In the folding position the transfer wheel blocks on its own.