![Thermo Scientific LTQ XL Скачать руководство пользователя страница 85](http://html.mh-extra.com/html/thermo-scientific/ltq-xl/ltq-xl_getting-started_1105110085.webp)
4
Tuning with Your Analyte in LC/ESI/MS Mode
Setting Up to Introduce Sample by Syringe Pump into Solvent Flow from an LC
Thermo Electron Corporation
LTQ XL Getting Started
73
b. Connect the other end of the PEEK tubing with a (brown)
fingertight fitting and a (brown) ferrule to the free end of the LC
Tee union. (See
Figure 31.
Divert/Inject valve, showing the correct setup for tuning by syringe
infusion and showing the flow of liquid through the valve in the
Detector and Waste positions
10. Connect an appropriate length of PEEK tubing (transfer line from the
LC) from the divert/inject valve to the LC, as follows:
a. Connect a length of PEEK tubing with a (stainless steel) nut and a
(stainless steel) ferrule to port 2 of the divert/inject valve.
b. Connect the other end of the PEEK tubing with a proper fitting and
a ferrule to the outlet of the LC.
11. Connect an appropriate length of PEEK tubing (waste line) from the
divert/inject valve to a waste container, as follows:
a. Connect a length of PEEK tubing with a (stainless steel) nut and a
(stainless steel) ferrule to port 1 of the divert/inject valve.
b. Insert the other end of the PEEK tubing in a suitable waste
container.
The MS detector is now properly set up to introduce your analyte by syringe
pump into solvent flow from an LC.
6
5
4
3
2
1
6
5
4
3
2
1
Waste Position
To LC Tee
Union
From
LC
To Waste
Plug
(optional)
To LC Tee
Union
From
LC
To Waste
Detector Position
Plug
(optional)