![Thermo Scientific LTQ XL Скачать руководство пользователя страница 123](http://html.mh-extra.com/html/thermo-scientific/ltq-xl/ltq-xl_getting-started_1105110123.webp)
6
Setting Up the Ion Source for Acquiring Data in APCI/MS/MS Mode
Installing the APCI Probe
Thermo Electron Corporation
LTQ XL Getting Started
111
Installing the APCI
Probe
Install the APCI probe into the Ion Max ion source housing
1. Connect the 8 kV cable to the corona needle high voltage receptacle as
follows:
a. Plug the 8 kV cable into the corona needle high voltage receptacle
on the right side of the top of the ion source housing.
b. Lock the cable by rotating the locking ring clockwise.
2. Be sure to unlock the probe locking lever (widest open position) before
attempting to install the probe.
3. Insert the APCI probe into the port in the ion source housing, align the
guide pin on the probe body at a 45 degree angle from the API interlock
block. See
4. Push the probe into the port until the guide pin meets with the probe
collar on the ion source housing.
5. Turn the probe 45 degrees clockwise and align the guide pin with the
slot in the API interlock block (you might need to pull the probe
towards you slightly to properly align the pin with the notch). Once you
have turned the probe far enough to align the pin with the alignment
notch at the rear of the port, push the probe straight in until the guide
pin stops at the bottom of the alignment notch.
6. Seat the probe all the way down into the alignment notch.
CAUTION
Handle the 8 kV cable with care.