![Thermo Scientific 42iQHL Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/thermo-scientific/42iqhl/42iqhl_instruction-manual_1105144027.webp)
Installation and Setup
Startup
Thermo Scientific
42iQHL Instruction Manual
2-9
Use the following procedure when starting the instrument.
1.
Turn the power ON.
2.
Allow 90 minutes for the instrument to stabilize.
3.
Set instrument parameters such as operating ranges and averaging times
to their appropriate settings. For more information about instrument
parameters, see the “
Operation
” chapter.
4.
Before beginning the actual monitoring, perform a multipoint
calibration as described in the “
Calibration
” chapter.
Figure 2–8.
Front Panel and touch Screen Display
Startup
Содержание 42iQHL
Страница 1: ...42iQHL Instruction Manual High Level NO NO2 NOx Analyzer 119018 00 27Sep2018 ...
Страница 2: ......
Страница 18: ......
Страница 28: ......
Страница 36: ...Operation Instrument Display 3 8 42iQHL Instruction Manual Thermo Scientific ...
Страница 98: ...Operation Settings 3 70 42iQHL Instruction Manual Thermo Scientific Digital I O Digital I O serial number ...
Страница 100: ...Operation Settings 3 72 42iQHL Instruction Manual Thermo Scientific Sample Valve Zero Valve Span Valve Bypass Pump ...
Страница 166: ......
Страница 192: ......
Страница 198: ...Maintenance Pump Rebuilding 5 6 42iQHL Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding ...
Страница 214: ...Servicing Fan Replacement 7 8 42iQHL Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 257: ...Servicing DMC Ozonator Thermo Scientific 42iQHL Instruction Manual 7 51 Figure 7 52 Remove Ammonia Scrubber ...
Страница 272: ......
Страница 308: ......
Страница 320: ......
Страница 321: ......