To help conserve gas, put as much of the equipment as is practical into the
chamber at this time. Any equipment that must be put through the
interchange with both doors open should be put in before the gas is turned
on. The layout of the equipment should be well planned. 6 to 8 BBL Gas
Pak™ disposable anaerobic indicator strips (Mfr. #R65055, available
through a variety of suppliers) should be placed in the work chamber at
this time for use during the start-up procedure.
The following is a list of other possible equipment:
• Absorbent Work Mats
• Microscope - a binocular type with a “high eye point” is recommended
• Electrical Loop Sterilizer - SEPCO Electrostat Loop Sterilizer is recom-
mended
• Hygrometer
• Test Tube Racks, Extra Tubes
• Inoculating Loops
• Waste Disposal Frame & Bags
1. Install the wafers before start-up.
Note
The correct position of the activated wafers is stamped on the inside
of the air filter door.
s
2. Open the air filter system door in the top center of the right side wall.
(See illustrations).
3. Slide the wafers into the correct slots -
top position = Charcoal filter
middle position = Palladium catalyst
wafer
Bottom position = Desiccant activated
wafer
2H
2
O
absorbed
2H
2
trace
O
2
H
2
S
1-6
Anaerobic System
Thermo Scientific
Section 1
Installation and Start-Up
Install Equipment
Charcoal, Catalyst &
Desiccant Wafers
Figure 1-2.
Filter and Wafers
Charcoal Filter
Palladium
Catalyst Wafer
Desiccant
Wafer