Connect the main supply of nitrogen to the serrated fitting, labeled
Anaerobic Gas, on the rear of the cabinet. The anaerobic gas should not
be connected during start-up.
Following the start-up procedure, reconnect the gas supplies for normal
operation.
Connect main supplies of both pure nitrogen and mixed gas to the
appropriate gas inlets at the back of the system.
Plug the foot switch line cord into the outlet labeled “Foot Switch”, on the
rear plumbing panel. Refer to Figure 1-2.
1. Put the cuff into the rubber glove with the narrow end toward the
fingers. Pull the glove up over the cuff until the rolled edge slips over
the edge of the cuff.
2. Cut four 6-inch strips of the clear plastic tape provided. Run a piece of
tape from the middle of the glove cuff over the edge and half-way
down into the inside of the cuff. Use the other three pieces of tape in
the same manner, equal distance around the cuff.
3. Put your hand in the glove and carefully push it down through the
sleeve until one-third to one-half of the cuff portion is protruding
from the end of the sleeve.
4. With the plastic tape, tape the glove tightly into the sleeve in a circular
manner. Cover approximately 3/4 of the cuff area with tape. Fold over
the end of the tape to make replacement of the glove easier.
Plug the system’s line cord into a suitable electrical outlet. See the
electrical data plate mounted on the unit for exact electrical specifications.
Anaerobic System 1-5
Thermo Scientific
Section 1
Installation and Start-Up
Connection for Start-Up
Connection for Normal
Operation
Connect the Foot
Switch (Optional)
Installing the Gloves
Connect to Power