
7 Maintaining the product
91
2.
Unlock the two lateral clip locks of the condensate pump and
pull off the pump head.
3.
Pull the inlet and outlet hoses off the sockets on the meas. box.
4.
Plug the inlet hose (length 25mm) and outlet hose (length
31mm) of the new pump onto the connecting sockets of the
meas. box.
5.
Push the pump onto the motor shaft until the clip locks engage.
Make sure that the tubes are not pinched or constrained.
6.
Attach cover.
7.11.4.
Replacing the motor of the condensate pump
The condensate pump is only available in instruments with
the gas preparation (GP) option.
1.
Unlock and remove the cover.
Содержание 350 Maritime V2
Страница 1: ...testo 350 Flue gas analyzer Instruction manual...
Страница 2: ...2...
Страница 26: ...4 Product description 26 4 2 Meas box 4 2 1 Overview 1 Condensate trap and condensate container...
Страница 106: ...0970 3511 en 05_GB...