5 First steps
34
- The Control Unit is powered by the mains unit.
- If the Control Unit is switched off the rech. batt. charging
process will start automatically. Switching the Control Unit on
has the effect of stopping battery charging and the Control Unit
being powered via the mains unit.
Meas. box via internal mains unit
> Connect the mains cable to meas. box and mains socket.
- The meas. box is powered via the internal mains unit.
- If the meas. box is switched off the rech. batt. charging process
will start automatically. Battery charging stops when the flue
gas analyser is switched on by the Control Unit.
Meas. box via DC-voltage input DC
✓
Cable with battery terminals and adapter for connection to
meas. box required (0554 1337, accessory).
- If the meas. box is switched off the rech. batt. charging process
will start automatically. Battery charging stops when the flue
gas analyser is switched on by the Control Unit.
5.2.2.
Connecting probes / sensors
Sensor detection takes place during the activation
process: Sensors that are required must always be
connected before the flue gas analyser is switched on,
or the flue gas analyser must be switched off and then
on again after a sensor change, so that the correct
sensor data can be read.
> Connect the required probes / sensors to the corresponding
ports.
5.2.3.
Occupying the trigger input
The trigger input can be used as a criterion to either start or stop
(ascending or descending flank) measuring programs.
Содержание 350 Maritime V2
Страница 1: ...testo 350 Flue gas analyzer Instruction manual...
Страница 2: ...2...
Страница 26: ...4 Product description 26 4 2 Meas box 4 2 1 Overview 1 Condensate trap and condensate container...
Страница 106: ...0970 3511 en 05_GB...