5 First steps
36
5.2.4.
Connecting system components
5.2.4.1.
Connection using contact strip
The Control Unit can be plugged onto the meas. box.
1.
Place the guide groove in the bottom side of the Control Unit
over the guide pins of the meas. box.
2.
Press the Control Unit against the meas. box until the locking/
unlocking buttons noticeably clicks into place
two times
.
To protect the display (e.g. during transport) the Control
Unit can also be inserted with the back facing up, however,
in this case there is no connection to the meas. box.
5.2.4.2.
Connection using a Data bus cable (accessory part to a bus
system)
testo data bus cables must not be used during electrical
storms.
Before connecting to a bus system, all analyzer units must
first be equipped with the identical country version and
firmware version.
or
Содержание 350 Maritime V2
Страница 1: ...testo 350 Flue gas analyzer Instruction manual...
Страница 2: ...2...
Страница 26: ...4 Product description 26 4 2 Meas box 4 2 1 Overview 1 Condensate trap and condensate container...
Страница 106: ...0970 3511 en 05_GB...