
AP-51xx Access Point Product Reference Guide
2-26
7.
Cable the AP-5181 using either the AP-5181 Power Tap (Part No. AP-PSBIAS-5181-01R) or
the Symbol Power Injector (Part No. AP-PSBIAS-1P2-AFR).
a. Connect a RJ-45 Ethernet cable between the network data supply (host) and the Power
Tap’s
DATA IN
connector or the Power Injector’s
Data In
connector.
b. Connect a RJ-45 Ethernet cable between the Power Tap’s
DATA/PWR OUT
connector
or the Power Injector’s
Data & Power Out
connector and the AP-5181 LAN port.
c. For Power Tap installations, have a certified electrician open the Power Tap enclosure,
feed the power cable through the unit’s
LINE AC
connector, secure the power cable to
the unit’s three screw termination block and tighten the unit’s LINE AC clamp (by hand)
to ensure the power cable cannot be pulled from the unit.
d. For Power Tap installations, attach a ground cable between the
EARTH GROUND
connector (on the back of the unit) to a suitable earth ground connection as defined by
your local electrical code.
e. Ensure the cable length from the Ethernet source (host) to the Power Tap (or Power
Injector) and AP-5181 does not exceed 100 meters (333 ft). Neither the Power Tap or
Power injector has an On/Off power switch. Each receives power as soon as AC power
is applied. For more information on using the see,
Symbol Power Injector and Power Tap
Systems on page 2-10
.
8.
Use the supplied cable connector to cover the AP-5181’s Console, LAN/PoE and WAN
connectors.
9.
Once power has been applied, Verify the behavior of the AP-5181 LEDs. For more
information, see
AP-5181 LED Indicators on page 2-29
.
NOTE
The access point must be mounted with the RJ45 cable connectors
oriented upwards to ensure proper operation.
CAUTION
Do not supply power to the AP-5181 Power Tap or Power Injector until
the cabling of the access point is complete.
CAUTION
For Power Tap installations, an electrician is required to open the
Power Tap unit, feed the power cable through the Line AC connector,
secure the power cable to the unit’s three screw termination block and
tighten the unit’s Line AC clamp (by hand) to ensure the power cable
cannot be pulled from the Power Tap enclosure. Only a certified
electrician should conduct the installation.
!
!
Содержание AP-51xx
Страница 1: ...AP 51xx Access Point Product Reference Guide...
Страница 2: ......
Страница 3: ...AP 51xx Access Point Product Reference Guide 72E 92949 01 Revision A January 2007...
Страница 4: ......
Страница 6: ......
Страница 16: ...AP 51xx Access Point Product Reference Guide xii...
Страница 43: ...Introduction 1 25 BSS2 Base radio MAC address 1 BSS3 Base radio MAC address 2 BSS4 Base radio MAC address 3...
Страница 44: ...AP 51xx Access Point Product Reference Guide 1 26...
Страница 76: ...AP 51xx Access Point Product Reference Guide 2 32...
Страница 92: ...AP 51xx Access Point Product Reference Guide 3 16...
Страница 214: ...AP 51xx Access Point Product Reference Guide 5 70...
Страница 534: ...AP 51xx Access Point Product Reference Guide 8 208...
Страница 590: ...AP 51xx Access Point Product Reference Guide A 12...
Страница 614: ...AP 51xx Access Point Product Reference Guide C 4...
Страница 620: ...AP 51xx Access Point Product Reference Guide IN 10...
Страница 621: ......