5.2.2 Hoisting
In the whole hoisting process, observe following rules:
•
Hoist the MV Station in a vertical manner. Do not drag or drop the MV Station on any
surface.
•
When the MV Station has been hoisted for about 300mm from the ground, stop to check
if all the connections are still firm. After confirmation, continue hoisting the MV Station.
•
When transported to the final location, the MV Station should be put down slowly and
steadily.
•
The final location should be firm, level, and well-drained. The MV Station is supported by
four bottom fittings on the ground.
The MV Station should be hoisted by using four top corner fittings as shown in the following
figure.