72
At this time, the intelligent power distribution cabinet can supply power for debugging tools,
test equipment, etc.
- - End
Subsequent Processing
1
After debugging, disconnect all the micro-circuit breakers of the power distribution
cabinet.
2
Stop the #1 unit through the LCD screen of inverter.
3
On the LCD screen of inverter, click "Function" -> "Set-parameter" –> "Run-parameter",
and set "Off-grid mode" to "disable".
4
Disconnect the LV switch (QS8) inside the intelligent power distribution cabinet, and
close the HV switch (QS9) of the power distribution cabinet.
10.7.2 High-voltage Mode
Applicable Scenario
The high-voltage mode is suitable for debugging the MV side when the grid cannot transmit
power.
Safety Precautions
Before operation, be sure to confirm that the main circuit is allowed to be
electrified and not loaded.
Operation Method
step 1 Disconnect the circuit breaker of the MV tramsformer, close the output switches of upstream
PV combiner boxes of inverter.
step 2 Close the DC load break switch 1 of inverter (QS1).
step 3 After the inverter LCD screen is powered on, stop the inverter through the LCD screen.