73
step 4 Close the HV switch (QS9) inside the intelligent power distribution cabinet, and disconnect
the LV switch (QS8).
step 5 Via the LCD screen of inverter, click "Function" -> "Set-parameter" –> "Run-parameter" -> "-
High voltage mode".
Parameter
Settings
Off-grid mode
High voltage mode
Off-grid output volt (%)
100%
Slope of off-grid output volt (%)
Set according to the capacity of the
transformer.
Off-grid output frequency(Hz)
60
step 6 Start the #1 unit through the LCD screen of inverter.
step 7 The AC circuit breakers will close automantically.
At this point, the inverter can be debugged.
- - End
Subsequent Processing
1
Check and confirm that all the micro-circuit breakers inside the intelligent power
distribution cabinet are in off state.
2
Stop the #1 unit through the LCD screen of inverter, click "Function" -> "Set-parameter"
–> "Run-parameter" -> "Off-grid mode", and set to "DIsable".
3
Check and confirm that the LV switch (QS8) inside the intelligent power distribution
cabinet is in off state and the HV switch (QS9) is in on state.
10.8 MPPT
Maximum Power Point Tracking (MPPT) is a technique that the MV Station uses to get the
maximum power from the PV arrays. PV arrays have a complex relationship between solar
irradiation, temperature and total resistance that produces a non-linear output efficiency
known as the I-V curve.
System Manual
Содержание SG3425UD-MV
Страница 2: ......
Страница 35: ...27 System Manual 5 Mechanical Installation...
Страница 121: ...M H 002011 www sungrowpower com Sungrow Power Supply Co Ltd...