20
•
Place the MV Station carefully and gently. Do not pull or push the MV Station on any
surface.
•
The place should be firm and flat, has good drainage and has no obstacles or outshoots.
The MV Station should be placed and supported by the four feet.
5.2
Hoisting the MV Station
5.2.1 Safety Precautions
•
Observe the safety operating rules of the crane at all times.
•
Standing within 5 to 10 meters of the hoisting areas is strictly forbidden!
Anybody standing under the boom or Station is strictly forbidden in the whole
hoisting process.
•
The hoisting work must be stopped in violent weather days. For example, in
strong wind, heavy rain, or thick fog conditions.
Carefully observe the following items:
•
All safety requirements must be met.
•
A professional instructor is needed in the whole hoisting process.
•
All the slings used must have the load-bearing capacity of at least 50,000kg/110200Ibs.
•
The crane should have sufficient arm length and radius of gyration.
•
All the connection point must be firmly connected.
•
The length of the slings can be adjusted appropriately according to on-site conditions.
•
Transport the MV Station in a level, smooth and steady way.
•
Transport the MV Station by connecting the four top corner fittings.
•
Some accessories may be needed to ensure the hoisting safety.
The following figure illustrates the hoisting operations. Circle A indicates the work areas of
the crane. Anybody standing inside the circle B is forbidden for safety considerations.