101
12.4.7 Checking the Lock and Hinge
Check the functionality and state of the lock and hinge of the MV Station after the cleaning
work. Lubricate the lock and hinge if necessary.
12.4.8 Checking the Sealing Strip
The sealing strip is used to prevent the water penetrating insider the MV Station. Check it
carefully for damage. Replace the faulty lighting devices in time.
12.5 Painting Make-up Measures
Check for the damages of the MV Station appearance:
Situation 1
: smudginess on the surface caused by water and dust that can be cleaned
Situation 2
: smudginess on the surface & damage to the finishing coat that cannot
be cleaned
Situation 3
: the undercoat is damaged and the primer is revealed
Maintenance and Operation Steps for Situation 1:
Materials:
•
Cleaning cloth
•
Water
•
Alcohol or other non-corrosiveness detergent
Figure
Step
1. Clean the smudginess on the surface by using a
cleaning cloth (or other cleaning tool) with water.
2. If the smudginess cannot be cleaned by water, use 97%
alcohol until the surface is clean enough to accept. (Or try
other local frequently-used non-corrosiveness detergent)
Maintenance and Operation Steps for Situation 2:
Materials:
•
Abrasive paper
•
Cleaning cloth
•
Water
•
Alcohol
•
Hairbrush
•
Paint RAL7035 / Munsell color JN-82 N8.2
System Manual
Содержание SG3425UD-MV
Страница 2: ......
Страница 35: ...27 System Manual 5 Mechanical Installation...
Страница 121: ...M H 002011 www sungrowpower com Sungrow Power Supply Co Ltd...