71
Prerequisites
Before operation, make sure that all isolating switches and miniature circuit
breakers in the intelligent power distribution cabinet are in the off state.
Operation Method
step 1 Disconnect the load-break switch of the MV transformer and close the output switches of
upstream PV combiber boxes of inverter.
step 2 Close the DC load break switch 1 of inverter(QS1).
step 3 After the inverter LCD is powered on, stop the inverter through the LCD.
step 4 Disconnect the HV switch (QS9) inside the intelligent power distribution cabinet, and close
the LV switch (QS8).
step 5 Via the LCD screen of inverter, click "Function" -> "Set-parameter" –> "Run-parameter" ->
"Off-grid mode", and set to "Low voltage mode".
Parameter
Settings
Off-grid mode
Low voltage mode
Off-grid output volt (%)
100%
Slope of off-grid output volt (%)
Set according to the capacity of the
transformer.
Off-grid output frequency(Hz)
60
step 6 Start the #1 unit via the LCD of the inverter.
System Manual