37
On site, determine the number of output cables and the wiring scheme according to actual
situation.
After wiring, reliably connect the cable connector to the grounding copper bar inside the
high-voltage room according to local standards and regulations, where the fastening torque
is 60~70N.m.
A
B
C
D
E
F
Copper bus
Cable lug
Bolt(M12)
Disc spring
washer
Flat washer
Nut
- - End
Further Operations
System Manual
Содержание SG3425UD-MV
Страница 2: ......
Страница 35: ...27 System Manual 5 Mechanical Installation...
Страница 121: ...M H 002011 www sungrowpower com Sungrow Power Supply Co Ltd...