6
Self test
The self test is mandatory for operation of inverters in Italy.
Function
The prerequisites for performing the self test are as follows:
n
The country
Italy was selected during initial commissioning.
n
The level of solar irradiation is high enough to ensure that the inverter can feed the grid.
During the self test, the inverter checks its switch-off behaviour with regard to too high / too low
grid voltage and frequency (6 test phases, duration of approx. 40 minutes). The following applies:
n
In each phase of the self test, the inverter changes its switch-off threshold, step-by-step
upwards/downwards from the set lower/upper limit values.
n
When the switch-off threshold reaches the actual grid voltage/frequency then the inverter
stores this information.
n
The data is shown on the display as follows:
–
The current values of the
first test phase are displayed first; see the following illustration.
–
The values of the subsequent test phases are added below (initially hidden).
–
If the self test succeeded then the message
Self test passed
is added below. The mes-
sage must be displayed and confirmed.
n
If the self test conditions are not satisfied, one of the
Messages of errors that prevent the
self test from running, p. 127 is displayed.
n
If a measurement lies outside the required tolerance during the self test then the self test is
cancelled and the inverter displays the message
Self test failed
. The inverter remains dis-
connected from the grid (relay open, no feeding) until the self test is passed successfully.
Note
The data stored in the inverter can be read using a PC and the InverterSelftestProtocol software.
More information on this is provided in the StecaGrid Service_InverterSelftestProtocol manual and
at www.stecasolar.com
⇒
PV grid connected
⇒
Software.
①
Lower / upper limit value according to the country setting
②
Measured actual grid voltage / frequency
③
Switch-off threshold (changed in steps)
④
Switch-off time = time between following events:
n
Switch-off threshold reaches the actual grid voltage / fre-
quency
n
The inverter disconnects itself from the grid
GB
747.431 | Z08 | 2014-01-31
126
Содержание coolcept StecaGrid 1800
Страница 76: ...DE 747 431 Z08 2014 01 31 76...
Страница 121: ...Entering system data 1 2 3 4 5 6 7 7 8 9 10 11 Fig 12 Data entry form for the system data GB 747 431 Z08 2014 01 31 121...
Страница 146: ...GB 747 431 Z08 2014 01 31 146...
Страница 147: ...1 Montage Installation Montage 148 2 Zertifikate Certificates Certificats 162 747 431 Z08 2013 12 10 147...
Страница 149: ...coolcept x 150 mm 240 mm 45 mm 210 mm 190 mm 320 mm 400 mm 748 339 Z01 747 431 Z08 2013 12 10 149...
Страница 162: ...2 Zertifikate Certificates Certificats 747 431 Z08 2013 12 10 162...
Страница 163: ...747 431 Z08 2013 12 10 163...
Страница 164: ...747431...