3. Press
rs
to change the value.
4. Press
SET
. The change is adopted.
5. Repeat steps 1 to 4 for the other parameters.
6. Press
ESC
. The check list is shown.
Display characteristic curve
1. The previously set reactive power characteristic curve is dis-
played graphically (example in Fig. left).
2. Press
ESC
. The check list is shown.
Finish
✔
Finish
has been selected in the check list and
SET
has been
pressed. One of 2 possible dialogues is displayed.
1. Proceed as follows, depending on the respective dialogue:
n
Dialogue
Settings are incomplete
: Press
SET
and
and work through the open items in the check list.
n
Dialogue
Are all settings correct?
:
Press
ESC
to correct settings or
Press and hold
SET
(> 1 s) to finish initial commis-
sioning.
2. If
SET
was pressed for a longer time then the inverter starts
anew and synchronises itself with the grid (Fig. left).
4.8 Switching on the DC supply
u
Set the DC circuit breaker on the inverter to position
I
(Fig.
left). After testing via the internal MSD (approx. 2 minutes),
the power fed into the grid can be shown on the display
(assuming that sunlight is present).
———————————————————————————
Notice
The DC circuit breaker on the coolcept-x devices can be
secured with a padlock to prevent unintentional switch-on
(maximum padlock size of 7 mm).
———————————————————————————
GB
747.431 | Z08 | 2014-01-31
112
Содержание coolcept StecaGrid 1800
Страница 76: ...DE 747 431 Z08 2014 01 31 76...
Страница 121: ...Entering system data 1 2 3 4 5 6 7 7 8 9 10 11 Fig 12 Data entry form for the system data GB 747 431 Z08 2014 01 31 121...
Страница 146: ...GB 747 431 Z08 2014 01 31 146...
Страница 147: ...1 Montage Installation Montage 148 2 Zertifikate Certificates Certificats 162 747 431 Z08 2013 12 10 147...
Страница 149: ...coolcept x 150 mm 240 mm 45 mm 210 mm 190 mm 320 mm 400 mm 748 339 Z01 747 431 Z08 2013 12 10 149...
Страница 162: ...2 Zertifikate Certificates Certificats 747 431 Z08 2013 12 10 162...
Страница 163: ...747 431 Z08 2013 12 10 163...
Страница 164: ...747431...