8-31
HDW-750/750CE V1
7. Video Tracking Recheck
Recheck the video tracking by performing steps 1
and 2 of the check procedure.
8. Tape Run Check
Check the tape running status (at drum exit side)
referring to Section 8-2-1.
When the Adjustment is Performed
9. CTL head height check
(Refer to Section 8-2-3.)
10. CTL head position check
(Refer to Section 8-2-4.)
11. CUE/TC head position check
(Refer to Section 8-2-8.)
12. CUE/TC head height check
(Refer to Section 8-2-5.)
8-2. Tape Run System Adjustment