7-129
HDW-750/750CE V1
Installation
10. Installing the MDC-13 board
(1) Align the position-setting hole of the new
MDC-13 board with the position-setting pin
of the mechanical deck assembly and install it
with the 13 precision screws.
The standard tightening torque value :
10
x
10
_
2
N
.
m (1 kgf
.
cm)
(2) Install the connector gard. (Fig.1)
n
Depending on the time of production at the
factory, there are sets that have no connector
gard.
11. Installing the MDR-14 board
Install the MDR-14 board by reversing the steps
of removal.
12. Installing the timing belt
Install the timing belt.
(Refer to Section 7-10.)
13. Installing the top sensor assembly
Install the top sensor assembly with the precision
screw.
(Refer to Section 7-28.)
14. Installing the gear block assembly
Install the gear block assembly with the three
precision screws.
(Refer to Section 7-24.)
15. Installing the cleaning assembly
Install the cleaning assembly with the precision
screw.
(Refer to Section 7-6.)
16. Installing the end sensor assembly
Install the end sensor with precision screw.
(Refer to Section 7-15.)
17. Installing the full top sensor assembly
Install the full top sensor assembly with precision
screw.
(Refer to Section 7-16.)
18. Installing the mechanical deck
assembly
Install the mechanical deck assembly with five
screws.
(Refer to Section 7-35.)
MDC-13
board
MDC-13 board
MDC-13
board
Connetor
gard
Connetor
gard
Fig1
Shaft of mechanical
deck assembly
Shaft of mechanical
deck assembly
Shaft of mechanical
deck assembly
View from the side
Precision screw
P1.4
x
3.5
Precision
screw
P1.4
x
3.5
Position-setting
hole
Position-
setting
hole
Position-setting
pin
Position-
setting pin
7-36. MDC-13 Board Replacement