UPS for 480 Vac Grid, User Guide, doc. rel. 4.0
156
The Define Timeouts screen appears:
Figure 141: Reliability Timeouts screen
This screen allows you to customize the time to transfer back to ECO Mode from Inverter after
an anomaly in the grid.
6.
Customize the settings in the Define Timeouts screen according to the selected customized
reliability setting you chose in the ECO mode screen.
Only the setting for the chosen Reliability Setting will be applied.
7.
Select Confirm.
You are returned to the System Type screen.