UPS for 480 Vac Grid, User Guide, doc. rel.4.0
8.3.4.
Operation > TRANSFER LOAD
From this menu you can move the load from the Inverter to the bypass voltage, or vice versa.
8.3.4.1.
Operation > Transfer load > TRANSFER LOAD TO INVERTER
The Transfer load to inverter and the Transfer load to bypass buttons will be
grayed out if the bypass and the inverter are not synchronized.
Transfers the load from the Bypass voltage to the Inverter voltage.
Figure 135: Operation, Transfer load to Inverter
The Transfer load to inverter button is grayed out after the load it transferred.
If you select Transfer load to Inverter the system will remain on bypass in the following
circumstances:
1.
Bypass ac input is faulty.
2.
Forced or manual bypass.
3.
Overload to the modules. Modules cannot support load.