Mounting
Instruction Manual ColorPlus 2
13045E/3
33
4.3
Mounting the photometer with sliding measuring cell
The following points must be observed for mounting a photometer with sliding measuring
cell:
The photometer with sliding measuring cell may only be installed in vertical sample lines.
Allow sufficient room for maneuver for the sliding measuring cell (operating and check-
ing position).
Please note the corresponding drawing for mounting the sliding measuring cell.
4.4
Mounting 4
th
clarification stage
4.4.1
Location selection
Note the following points for the operating location:
The electrical supply must be ensured.
The water supply must be ensured as described in the technical data.
The compressed air connection must be ensured as described in the technical data (Sec-
tion 2.9.2).
The drainage of water must be possible without obstructions.
The system should not be exposed to direct sunlight during measurement as the meas-
urement can be skewed by excessive external light.
4.4.2
Mounting the units for the 4
th
clarification stage
Observe the
COLORPLUS-4KL-MB
dimension sheet when mounting the 4
th
clarification
stage.
Only lift units for the 4
th
clarification stage on the blue base plate.
WORKSTEP
ADDITIONAL INFO / IMAGES
1.
Drill four holes in the wall for the threaded an-
chors according to the supplied drill template.
Preferably, use M6 threaded anchors
for fastening units for the 4
th
clarification
stage. The threaded anchors should project 2
or maximum 3 cm from the wall.
2.
Fasten the threaded anchors in the wall.
3.
Fasten the corresponding unit of the 4
th
clarifi-
cation stage on the threaded anchors.