Instruction Manual ColorPlus 2
Decommissioning/Storage
102
13045E/3
12
Decommissioning/Storage
12.1
Decommissioning the photometer
The aim of decommissioning is to prepare the individual components of the system properly
for storage.
WORKSTEP
ADDITIONAL INFO / IMAGES
1.
Interrupt the service voltage to the instrument.
2.
Stop the sample flow and let the measuring
cell run empty.
3.
Remove the electrical connections on the con-
trol unit.
Section 5
4.
Remove cleaning agent connections carefully.
Injuries to the eyes and skin due to
the uncontrolled release of cleaning
agent into the surrounding area.
Non-observance of this warning can lead to
permanent damage to the eyes and skin.
Adhere to the following instructions:
Wear protective goggles.
Wear gloves and safety clothing.
Carry out this step only in
the case of the 4
th
clarification
stage.
5.
Remove the control unit and pack for storage.
6.
Remove the instrument.
7.
Clean and dry the instrument.
8.
Clean and dry the measuring cell.
9.
Close all openings on the photometer.
10. Close all openings on the measuring cell.