Commissioning
5.3 Procedure for commissioning via STARTER
Drive converter cabinet units
Operating Instructions, 07/07, A5E00288214A
121
3. Enter a project name and, if necessary, the author, memory location and a comment.
4. Click Continue > to set up the PG/PC interface.
Figure 5-5
Set up interface
Note
The online connection to the drive unit can only be established via PROFIBUS.
5. Click Change and test... and set up the interface in accordance with your device
configuration.
The Properties..., Copy..., and Select... pushbuttons are now active.
Содержание SINAMICS S150
Страница 2: ......
Страница 6: ...Preface Drive converter cabinet units 6 Operating Instructions 07 07 A5E00288214A ...
Страница 14: ...Table of contents Drive converter cabinet units 14 Operating Instructions 07 07 A5E00288214A ...
Страница 28: ...Device overview 2 5 Type plate Drive converter cabinet units 28 Operating Instructions 07 07 A5E00288214A ...
Страница 519: ......
Страница 520: ...Siemens AG Automation and Drives Large Drives P O Box 4743 90025 NÜRNBERG GERMANY www ad siemens com A5E00288214A ...