
Function description
Each time the forced checking procedure starts, the converter checks its circuits to switch off the
torque.
You start the forced checking procedure each time that the STO function is selected.
Using a timer block, the converter monitors as to whether the forced checking procedure is
regularly started.
0RQLWRULQJWLPH
)RUFHGFKHFNLQJSURFHGXUHRIWKH
EDVLFIXQFWLRQVLVUHTXLUHG
6WDUWIRUFHGFKHFNLQJSURFHGXUHRI
WKHEDVLFIXQFWLRQV
672LV
DFWLYH
$
7
Figure 8-36
Starting and monitoring the forced checking procedure (test stop)
8.15.2.7
Setting forced checking procedure
Overview
You must set the time interval in which, as a minimum, you must start the forced checking
procedure at least once.
Requirement
You are online with Startdrive.
Function description
Procedure
1. Select the screen form for setting the forced checking procedure.
2. Set the monitoring time to a value to match your application.
3. Using this signal, the converter signals that a forced checking procedure (test stop) is
required.
Interconnect this signal with a converter signal of your choice.
You have set the forced checking procedure (test stop) for the Basic Functions.
❒
Advanced commissioning
8.15 Safe Torque Off (STO) safety function
Distributed converter for SIMOGEAR geared motors
252
Operating Instructions, 10/2020, FW V4.7 SP13, A5E31298649B AL
Содержание SINAMICS G110M
Страница 2: ......
Страница 426: ...Index Distributed converter for SIMOGEAR geared motors 424 Operating Instructions 10 2020 FW V4 7 SP13 A5E31298649B AL ...
Страница 427: ......