Operation & Maintenance Manual
──
LG936 Wheel Loader
73
Digging Piled Soil or Blasted Rock
When digging piled soil or blasted rock, the loader should face the material and do as follows:
z
If it is needed to lower the bucket while driving the machine
forward, stop the machine when the bucket is about 30cm away
from the ground, and then lower it slowly. If the bucket hits the
ground, the front tires will come off the ground and the tires will
slip.
z
The machine must slow the speed immediately when it reaches the material pile. Step the
accelerator pedal, and enter the material pile with the bucket
simultaneously.
z
Keep the bucket horizontal when loading the stockpil, while
make it a dumping angle down when loading the blasted rock.
Notice
:
Forbid getting the blasted rock under the bucket which will make the front tires deviate from the
ground and skid. Try to hold the load in the center of the bucket; otherwise, if the load is on one side
of the bucket, it will be unbalanced.
z
Raise the lift arm to prevent the bucket from going in too deep
while thrusting the bucket into the material. The tires will bring
ample traction by raising the lift arm.
z
If enough material is loaded into the bucket, operate the working
equipment control levers (or handle) to take back the bucket in
order to load it fully.
Remark:
If the shovel edge moves up and down when thrusting material into the bucket or when digging, the
Содержание LG936
Страница 120: ...110 Figure5 7 Electric System Theory Using YC6108G and TD226B Engine Machinery Control...
Страница 121: ...111 Figure5 8 Electric System Theory Using Weifang TD226B Engine Pilot Control Combined Switch...
Страница 122: ...112 Figure5 9 Electric System Theory Using Dongfeng CUMMINS 6BT5 9 Engine Pilot Control Combined Switch...