Operation & Maintenance Manual
──
LG936 Wheel Loader
III
Operation & Maintenance Manual
Concise Guide
All reasonable steps have been taken to ensure that this publication is correct and
complete, but should any user be in doubt about any detail, clarification may be sought
from Shandong Lingong construction machinery Co. Ltd. or their accredited
representative. The information in this document is subject to change without notice
and should not be construed as commitment by Shandong Lingong construction
machinery Co. Ltd. Shandong Lingong construction machinery Co. Ltd accepts no
responsibility for any errors that may appear in this document.
○
R
Shandong Lingong construction machinery Co. Ltd, P. R. China
All rights reserved. The contents of this publication may not be reproduced in any form,
or communicated to a third part without prior written permission of Shandong Lingong
construction machinery Co. Ltd.
Shandong Lingong construction machinery Co. Ltd
Linyi Economic Development Zone
Linyi, 276023
Shandong Province
P. R. China
Tel
:
+86 539 8785800
Fax:
+86 539 8785698
Email:
Website:
Содержание LG936
Страница 120: ...110 Figure5 7 Electric System Theory Using YC6108G and TD226B Engine Machinery Control...
Страница 121: ...111 Figure5 8 Electric System Theory Using Weifang TD226B Engine Pilot Control Combined Switch...
Страница 122: ...112 Figure5 9 Electric System Theory Using Dongfeng CUMMINS 6BT5 9 Engine Pilot Control Combined Switch...