Basic Relay Operations
Readying the Relay for Field Application
This procedure is a guide to help you ready the relay for field application. If you
are unfamiliar with the steps in this procedure, see the many relay usage exam-
ples presented in this section. This is a suggested procedure; modify the proce-
dure as necessary to conform to your standard company practices.
Step 1. Open the appropriate low-voltage breaker(s) and remove fuses to ver-
ify removal of control power and ac signals from the relay.
Step 2. Isolate the relay TRIP control output.
Step 3. Perform point-to-point continuity checks on the circuits associated
with the relay to verify the accuracy and correctness of the ac and dc
connections.
Step 4. Apply power to the relay.
The green
ENABLED
LED on the front panel will illuminate.
Step 5. Use an SEL-C234A cable to connect a serial terminal to the relay.
Step 6. Start the terminal (usually a PC with terminal emulation software).
Step 7. Establish communication with the relay at Access Level 0.
Step 8. Proceed to Access Level 2 (see
Changing the Default Passwords in
Step 9. Change the default passwords (see
Changing the Default Passwords
).
Step 10. Set the DATE and TIME (see
Making Simple Settings Changes on
Step 11. Use test sources to verify relay ac connections (see
Metering Quantities on page 3.35
Step 12. Verify control input connections.
Step 13. Verify control output connections.
Step 14. Perform protection element tests.
Step 15. Set the relay (see
Making Simple Settings Changes on page 3.15,
and
Section 6: Protection and Protection Appli-
cation Examples
in the product-specific instruction manual.
Step 16. Connect the relay for tripping/closing duty.
Step 17. From Access Level 2, use a communications terminal to issue appli-
) to clear the relay data buffers.
Step 18. Connect the secondary voltage and current inputs.
Step 19. Use the
MET
command or the QuickSet HMI to view relay metering
to confirm secondary connections (see
Table 3.9
Communications Port Commands That Clear Relay Buffers
Communications Port Command
Task Performed
MET RD
Reset demand meter data
MET RP
Reset peak demand meter data
MET RE
Reset energy meter data
MET RM
Reset maximum/minimum meter data
HIS CA
Reset event report and history buffers
SER CA
Reset Sequential Events Recorder data
Содержание SEL-421-4
Страница 6: ...This page intentionally left blank ...
Страница 14: ...This page intentionally left blank ...
Страница 30: ...This page intentionally left blank ...
Страница 104: ...This page intentionally left blank ...
Страница 128: ...This page intentionally left blank ...
Страница 536: ...This page intentionally left blank ...
Страница 584: ...This page intentionally left blank ...
Страница 616: ...This page intentionally left blank ...
Страница 696: ...This page intentionally left blank ...
Страница 750: ...This page intentionally left blank ...
Страница 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Страница 776: ...This page intentionally left blank ...
Страница 932: ...This page intentionally left blank ...
Страница 976: ...This page intentionally left blank ...
Страница 1024: ...This page intentionally left blank ...
Страница 1038: ...This page intentionally left blank ...
Страница 1064: ...This page intentionally left blank ...
Страница 1128: ...This page intentionally left blank ...
Страница 1206: ...This page intentionally left blank ...
Страница 1316: ...This page intentionally left blank ...
Страница 1350: ...This page intentionally left blank ...
Страница 1464: ...This page intentionally left blank ...
Страница 1468: ...This page intentionally left blank ...
Страница 1492: ...This page intentionally left blank ...
Страница 1518: ...This page intentionally left blank ...