![Schweitzer Engineering Laboratories SEL-421-4 Скачать руководство пользователя страница 226](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-421-4/sel-421-4_instruction-manual_1216726226.webp)
5.66
SEL-421 Relay
Instruction Manual
Date Code 20171021
Protection Functions
Out-of-Step Logic (Zero Settings)
Detection of Ground Faults During a Pole-Open
Regarding the ground-distance elements supervision, if the pole-open OOS logic
(OSBA, OSBB, OSBC, see
) is de-asserted, AND 4 turns off. When
AND 4 turns off, the ground-distance elements cannot cause the swing signature
detector to assert.
shows the pole-open logic that blocks the ground-
distance elements during a power swing condition.
If a power swing occurs during an open-pole condition, the power swing as seen
by the relay is no longer balanced. The open-pole OOS blocking logic determines
which phase is open so that the relay can correctly identify faults that may occur
on the closed phases during the power swing. To identify the open phase, the
relay calculates the angle of the ratio of the zero-sequence current and the nega-
tive-sequence currents. If the angular relationship indicates a fault, the logic
shown in
turns off AND 4, thus preventing the swing signature detec-
tion (SSD) from asserting. When SSD is deasserted, the distance elements can
clear the fault.
For example, if the A-Phase is open, the angle of the ratio normally lies between
–60 and +60 degrees. If a fault now occurs on B- or C-Phase (or both), this angu-
lar relationship is no longer true. In
, OSBA asserts if either B-Phase
or C-Phase is open, and no fault is present. If a fault occurs on B-Phase or
C-phase (or both), OSBA deasserts because the angular relationship indicates a
fault.
Figure 5.47
Logic Diagram of the Three-Phase Fault Detector
| d2SCV1_UF |
0.23
max{0.1, cos(Z1ANG)}
| SCV1 |
| dSCV1_S |
0.01
OSB_I
R1T
| dSCV1_S |
max{0.1, cos(Z1ANG)}
0
CYC
6
CYC
2
CYC
0
CYC
20
CYC
0
CYC
5
CYC
0
CYC
DTF
Figure 5.48
Pole-Open OOS Blocking Logic
SPO
SPOA
AND 3
AND 1
AND 2
OR 1
OR 2
AND 4
AND 5
AND 6
AND 7
AND 8
SPOB
SPOC
3IOLFA — 3IA2LFA
50QR
50QF
OSBB
OSBC
OSBA
ENABLE
50GR
50GF
OR 3
OR 4
OR 5
—60 to 60
60 to 180
—60 to —180
Содержание SEL-421-4
Страница 6: ...This page intentionally left blank ...
Страница 14: ...This page intentionally left blank ...
Страница 30: ...This page intentionally left blank ...
Страница 104: ...This page intentionally left blank ...
Страница 128: ...This page intentionally left blank ...
Страница 536: ...This page intentionally left blank ...
Страница 584: ...This page intentionally left blank ...
Страница 616: ...This page intentionally left blank ...
Страница 696: ...This page intentionally left blank ...
Страница 750: ...This page intentionally left blank ...
Страница 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Страница 776: ...This page intentionally left blank ...
Страница 932: ...This page intentionally left blank ...
Страница 976: ...This page intentionally left blank ...
Страница 1024: ...This page intentionally left blank ...
Страница 1038: ...This page intentionally left blank ...
Страница 1064: ...This page intentionally left blank ...
Страница 1128: ...This page intentionally left blank ...
Страница 1206: ...This page intentionally left blank ...
Страница 1316: ...This page intentionally left blank ...
Страница 1350: ...This page intentionally left blank ...
Страница 1464: ...This page intentionally left blank ...
Страница 1468: ...This page intentionally left blank ...
Страница 1492: ...This page intentionally left blank ...
Страница 1518: ...This page intentionally left blank ...