![RS PRO 917-6298 Скачать руководство пользователя страница 106](http://html.mh-extra.com/html/rs-pro/917-6298/917-6298_instruction-manual_1496054106.webp)
IIT-2000/2010/5000/5010 Instruction Manual/English
104
05/08/2015 Version No. 001
I R
G B
A CW
D CW
E
F R E Q =
0 H z
6
0
100
k
V
A
E
R
M
T I
E
= 0 0 1 . 0 S
R
0 0 m A
E
R F
=
#
0 .
0
1 . 0 0 m A
I
H
E
S
= 0
T
0 0 . 1 S
0
A M P
=
R
Y
READY status
M
A U O
T
N A
_
0
A U T O = 0 0 1 - 1 0
D
m A
3. The READY indicator will be lit blue when in the
READY status.
READY
4. Press the START button when the tester is in the
READY status. The AUTO test starts
automatically and the display changes to TEST
status.
START
5. The TEST indicator will be lit orange when in the
TEST status.
TEST
6. Each test will start by showing the remaining ramp up time,
followed by the remaining test time. Each test will be tested in
sequence until the last test has finished or the test is stopped.
I R
G B
A CW
D CW
F R E Q =
0 H z
6
0
100
k
V
S
E
T
M
T I
E
= 0 0 3 . 2 S
R
0 0 m A
E
R F
=
#
0 .
0
1 . 0 0 m A
I
H
E
S
= 0
T
0 0 . 1 S
0
A M P
=
R
T
remaining TIMER
time
00 37
m
A
remaining RAMP time
E
M
A U O
T
N A
_
1
A U T O = 0 0 1 - 0 0
Содержание 917-6298
Страница 1: ...Instruction Manual IIT 2000 2010 5000 5010 Electrical Safety Tester EN FR DE IT SP ...
Страница 2: ......