Safety reliably produced.
© RLS Wacon analytics GmbH ∙ +49 (0)5121 28126 0 ∙
Subject to
change without notice
46
Operation and handling
Commissioning
Make sure that the analyser is installed according to the instructions and that the
programme switches SW1-SW4 are programmed according to the desired
requirements.
Switching on the unit
•
Switch on the power supply e.g., via the optional connection
box.
•
The calculated level of the reagent bottle is displayed for one
second.
See page 51.
After switching on
•
The green LED "limit value" flashes because no measurement
has been carried out yet.
•
When the input contact is open, the yellow LED "Input contact
open" also flashes.
Insert a full reagent bottle and reset reagent level
•
Insert a full reagent bottle into the LIMES
•
Press and hold the "Reagent" and "Reset" buttons
simultaneously until the LEDs "Reagent deficiency" (blue) and
"Device malfunction" (red) light up simultaneously
For more information, see page 53
Only reset the fill quantity if you have inserted a full bottle
Deaerate dosing pump
•
Press and hold the "Reagent" button for 10 seconds to pump
reagent from the newly inserted bottle into the measuring chamber
and to push the air bubbles out of the tube.
(During this time the stirring blade rotates).
Filling the measuring chamber with water
•
Press the "Valve" button until the measuring chamber has filled
with water.
Содержание 32-074165
Страница 76: ......