![RLS Wacon 32-074165 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/rls-wacon/32-074165/32-074165_operating-instructions-manual_1467173038.webp)
Safety reliably produced.
© RLS Wacon analytics GmbH ∙ +49 (0)5121 28126 0 ∙
Subject to
change without notice
38
Operation and handling
Before commissioning
•
Make sure that the unit is well secured to a wall or suitable suspension.
•
Ensure that the water quality meets the specified requirements. If necessary, take
suitable measures to improve the supply water quality (e.g., installation of an
activated carbon filter).
•
Make sure that a full reagent bottle is inserted.
•
Check that the Leur connections of the peristaltic pump cassette to the measuring
chamber and the bottle have been screwed on tightly.
•
Check that the correct reagent type is used for the application.
•
Check that the expiry date of the reagent has not expired.
•
Make sure that all water-bearing parts are tight and that the inlet and outlet are
connected the right way round.
•
Make sure that the water treatment plant to be monitored is in operation and
supplying sample water.
•
Make sure that the maximum permissible operating pressure on the water supply
line is not exceeded. If necessary, fit a throttle valve.
•
If in doubt, consult a specialist or contact your supplier or the manufacturer.
Make sure that the input and output contacts of the analyser are connected in the
desired way to the water treatment plant to be monitored.
Make sure that the electrical connections are mounted correctly.
If in doubt, consult a specialist or contact your supplier or the manufacturer.
Voltage
Содержание 32-074165
Страница 76: ......