Safety reliably produced.
© RLS Wacon analytics GmbH ∙ +49 (0)5121 28126 0 ∙
Subject to
change without notice
44
Operation and handling
The following examples should make it easier for you to choose the right setting:
Example 1: Analyses are to be carried out continuously at a fixed time interval
In this case, the programme switch SW3 = OFF and no flow monitor is connected. The input
contact is provided with a jumper instead.
Example 2: Analyses are carried out at a fixed time interval when a flow monitor reports
flowing water
The programme switch SW3 is in the OFF position. The flow monitor is connected to the input
contact INPUT instead of the jumper. The first analysis after switching on the unit takes place
after 3 minutes, even if the flow monitor reports no flowing water. The subsequent analyses only
take place if there is flowing water in the set interval. The pausing of the analysis interval by the
flow monitor is indicated by the yellow LED flashing. If the flow monitor reports flowing water
after a standstill period, an analysis is carried out immediately.
Example 3: The analysis is started by an external controller
To preset the analysis interval by a control, the control is connected to the input contact by
means of a potential-free switch. The programme switch SW3 is set to the ON position (external
analysis start) to start analyses by a switching pulse at the input contact. If the input contact is
permanently bridged, analyses are carried out continuously.
Usually, the programme switches SW1 and SW2 are also set to OFF, thus deactivating the
internal analysis interval.
Input contact LIMESBase
With the LIMESBase, the function of the input contact is not active. Controls or switches
connected to the input contact do not start or stop analyses. To enable the input contact
function, you need an upgrade kit, which you can purchase from us.
For more information, see page 8, 21 and 68
Содержание 32-074165
Страница 76: ......